It was created to expand the technological capabilities of a tracked excavator starting from 22 tons. It is designed for drilling leader wells with augers up to 14 m deep. A special feature of the mast design is that the mast is installed directly on the boom of the excavator – without removing the boom part of the base machine, the digging unit is cheaper.
The rapid installation of the digging unit on the boom of the base excavator and dismantling to its original state with a bucket is carried out in 1-2 shifts, due to the modular version of additional options and does not fundamentally affect the systems and design of the basic machine itself.
The basic machine becomes universal. It can perform both its usual functions and install piles.
And if we provide for the alternate use of a hydraulic motor with a drilling tool and a pile driver in the mast design, then, provided the base machine is sufficiently stable, we will get
3 functions (excavator, pile driver, drilling rig) in 1 installation
Description
The price is by agreement with VAT. 1 year warranty. Possible sale on lease. Ready for operation. Supervising the installation of the mast with driver training. Post-warranty service and repairs
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.