Special machinery category
Special machinery manufacturer
Страна
City
Price
From
To
Condition
Availability
Year of manufacture
From
to
Source

Sale of special equipment in Елабуге

Found 67 sales listings
By Relevance
Display priority?
By Relevance
Publication Date
Publication Date
Price
Price
Year of Issue
Year of Issue
Mileage
Mileage
Motor Hours
Motor Hours
MOBILE LIFTING UNIT FOR WELL REPAIR AND DRILLING (UPRB-140)
The installation is designed for the development and overhaul of oil wells, as well as drilling by rotary method or downhole engines of wells for various purposes: prospecting, hydrogeological, water intake, production (oil, gas.) in areas with temperate and cold climates at ambient temperatures from -45 ° C to +40 ° C, placement category 1 according to GOST 151510.

Permissible load on the hook with the installation of guy ropes on the ground, kN (t) 1400(140)...
Negotiable price
+7 (800) 700-16-25
#30757
LIFTING INSTALLATION FOR REPAIRING AND DRILLING WELLS ON THE RKR CHASSIS (UPR-100)
The mobile lifting unit "UPR-100" is designed for major repairs, drilling and development of deep wells in temperate and cold (district 12) macroclimatic areas according to GOST 16350 with ambient temperatures from -45 ° C to +40 °C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30758
LIFTING INSTALLATION FOR REPAIRING AND DRILLING WELLS ON THE MZKT CHASSIS (UPR-100)
It is designed for drilling with a rotor and downhole motors of wells with a depth of 2500m (with a column weight of 24 kg / m), major repairs, development and restoration of oil and gas wells with a depth of up to 5000 m. (CNT 14kg/m) in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30759
LIFTING INSTALLATION FOR REPAIRING AND DRILLING WELLS BASED ON THE SELF-PROPELLED CHASSIS PPS-5 (UPR-100)
It is designed for drilling with a rotor and downhole motors of wells with a depth of 2500m (with a column weight of 24 kg / m), major repairs, development and restoration of oil and gas wells with a depth of up to 5000 m. (CNT 14kg/m) in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30760
LIFTING INSTALLATION FOR REPAIRING AND DRILLING WELLS BASED ON A SEMI-TRAILER (UPR-100P)
It is designed for drilling with a rotor and downhole motors of wells with a depth of 2500m (with a column weight of 24 kg / m), major repairs, development and restoration of oil and gas wells with a depth of up to 5000 m. (CNT 14kg/m) in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30761
MOBILE LIFTING UNIT FOR REPAIRING AND DRILLING WELLS ON THE MZKT CHASSIS (UPRB-125)
The lifting installation for repairing and drilling wells UPRB-125 is designed for
drilling wells with a depth of 2,700 m (with a column weight of 24 kg/m) by a rotor and downhole motors;
-major repairs, development and restoration of oil and gas wells up to 5,400 m deep. (TUBING is 14 kg/m). ...
Negotiable price
+7 (800) 700-16-25
#30762
MOBILE LIFTING UNIT FOR REPAIRING AND DRILLING WELLS ON THE CHASSIS OF BASES (UPRB-125)
The lifting installation for repairing and drilling wells UPRB-125 is designed for
drilling wells with a depth of 2,700 m (with a column weight of 24 kg/m) by a rotor and downhole motors;
-major repairs, development and restoration of oil and gas wells up to 5,400 m deep. (TUBING is 14 kg/m). ...
Negotiable price
+7 (800) 700-16-25
#30763
MOBILE LIFTING UNIT FOR REPAIRING AND DRILLING WELLS BASED ON A SEMI-TRAILER (UPRB-125)
The lifting installation for repairing and drilling wells UPRB-125 is designed for
drilling wells with a depth of 2,700 m (with a column weight of 24 kg/m) by a rotor and downhole motors;
-major repairs, development and restoration of oil and gas wells up to 5,400 m deep. (TUBING is 14 kg/m)....
Negotiable price
+7 (800) 700-16-25
#30764
LIFTING UNIT FOR WELL REPAIR AND DRILLING BASED ON SELF-PROPELLED CHASSIS PPS-4 (APRS-40C4)
The APRS-40C4 unit is designed for rotary drilling with direct face washing in soft and medium-hard rocks of structural exploration wells, hydrogeological and production wells for water, as well as for repairing wells where the maximum loads will not exceed the "Permissible load on the hook" parameter in accordance with its load capacity.

The unit allows you to carry out the following work: ...
Negotiable price
+7 (800) 700-16-25
#30779
VACUUM OIL COLLECTOR (AKN-10)
It is designed to collect spilled oil, gas condensate, petroleum products and non-aggressive process fluids, as well as to transport them to recycling and processing sites.
Tank capacity, m3 10
Actual tank capacity, m3 10±1.5% ...
Negotiable price
+7 (800) 700-16-25
#30780
MIXING PLANT US 16
It is intended for transportation of dry powdery materials (cement, grouting mixtures, etc.), for the mechanically controlled supply of these materials by screw conveyors (screws) and preparation of grouting solutions during cementing of oil and gas wells.

KAMAZ 43118 mounting base ...
Negotiable price
+7 (800) 700-16-25
#30781
MIXING UNIT (US 20x50)
It is intended for transportation of dry powdery materials (cement, grouting mixtures, etc.), for the mechanically controlled supply of these materials by screw conveyors (screws) and preparation of grouting solutions during cementing of oil and gas wells.

The largest mass of transported material on roads, tons (when mounted on a KAMAZ 63501 chassis) ...
Negotiable price
+7 (800) 700-16-25
#30782
REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
The RKU-25 coiled tubing installation is designed for launching and lifting and technological operations using BDT during major, routine repairs and intensification of oil and gas wells (elimination of hydrate, paraffin, sand deposits and plugs, acid treatment of the bottomhole zone, and so on), without damping them at a pressure at the sealed mouth of up to 70 MPa.

The field of application is the implementation of technological operations for the restoration of oil, gas and gas condensate wells. ...
Negotiable price
+7 (800) 700-16-25
#30788
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
The installation is designed for the following operations:
- for routine repairs of wells equipped with rod-type plug-in pumps in order to replace the PUS and carry out treatments of the bottomhole zone and the borehole, flushing the tubing column, well development, etc. using non-coupling long-length pipes (hereinafter referred to as BDT);
- for repairing wells with a hook load of up to 8 tons; ...
Negotiable price
+7 (800) 700-16-25
#30789
LIFTING UNIT FOR WELL REPAIR BASED ON THE RKR CHASSIS (APR-80)
The unit is designed for major repairs and development of oil and gas wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30790
LIFTING UNIT FOR WELL REPAIR (APRS-12)
The APRS-12 lifting well repair unit (hereinafter referred to as the unit) is designed for routine well repairs, with the possibility of adjusting and centering the mast, lowering and lifting the ESP (installation of submersible centrifugal pumps), and rod screw pumps.

The unit allows you to perform the following operations: ...
Negotiable price
+7 (800) 700-16-25
#30791
LIFTING UNIT FOR WELL REPAIR (APRS-18)
The lifting unit for the repair of inclined wells APRS-18 is designed for routine well repairs.
The unit allows performing the following operations during the repair process:
- mobile movement from well to well using a tractor or a car; ...
Negotiable price
+7 (800) 700-16-25
#30792
EXPLORATION DRILLING RIG (URB-30)
The URB-30 installation is designed for structural prospecting drilling for oil and gas by rotary method in soft and medium-hard rocks with direct flushing, as well as drilling water wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

In the basic configuration, the installation is equipped with a BA-15 swivel, an NB-50 pump, an R-410 rotor, a top-mounted worker's balcony, a GS-250 generator, and a 2000x1500 mm work platform....
Negotiable price
+7 (800) 700-16-25
#30793
LIFTING UNIT FOR WELL REPAIR (APRS-32/40)
The APRS-32/40 unit is designed for underground repair and development of oil and gas wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 °C to +40 °C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30794
LIFTING UNIT FOR THE REPAIR OF INCLINED WELLS (APRS-40N)
The unit is designed for carrying out underground repairs of wells with the mouth located at an angle of 45°- 75° relative to the earth's surface, including for performing lifting operations with depth-pumping rods Ø22, 25 mm and tubing Ø48, 60, 73, 89 mm, mechanized screwing-unscrewing rods and pipes with the use of a hydraulic wrench, installation and dismantling of fountain fittings and surge protection equipment.

The design of the unit provides a mobile system for centering the mast relative to the wellhead in 3 coordinates....
Negotiable price
+7 (800) 700-16-25
#30795
LIFTING UNIT FOR WELL REPAIR AND DRILLING BASED ON SELF-PROPELLED CHASSIS PPS-4(APRS-40C4)
The APRS-40C4 unit is designed for rotary drilling with direct face flushing in soft and medium-hard rocks of structural exploration wells, hydrogeological and production wells for water, as well as for repairing wells in which the maximum loads will not exceed the Permissible load on the hook in accordance with its load capacity..

The unit allows you to carry out the following work: ...
Negotiable price
+7 (800) 700-16-25
#30796
LIFTING UNIT FOR WELL REPAIR BASED ON URAL CHASSIS (APRS-40M)
The unit is designed for underground repair and development of oil and gas wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 °C to +40 °C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30797
LIFTING UNIT FOR WELL REPAIR BASED ON KAMAZ CHASSIS (APRS-40 KAM)
The unit is designed for underground repair and development of oil and gas wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 °C to +40 °C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30798
LIFTING UNIT FOR WELL REPAIR BASED ON SELF-PROPELLED CHASSIS PPS-4 (APRS-50S)
The APRS-50C unit is designed for the repair and development of oil and gas wells (OLS, cattle and OS) with such depths at which the maximum loads, including during the elimination of accidents (seizures) expected during the repair process, will not exceed the Permissible load parameter the hook" according to its load capacity.

The unit allows for the following operations: ...
Negotiable price
+7 (800) 700-16-25
#30799
LIFTING UNIT FOR WELL REPAIR BASED ON KAMAZ CHASSIS (APRS-50 KAM)
The unit is designed for development, major and underground repairs of oil and gas wells in macroclimatic areas with a temperate climate at ambient temperatures from -45 ° C to +40 ° C.

Main design features and operational advantages: ...
Negotiable price
+7 (800) 700-16-25
#30800
Items per page:
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with the Personal Data Processing Policy.