The RKU-25 coiled tubing installation is designed for launching and lifting and technological operations using BDT during major, routine repairs and intensification of oil and gas wells (elimination of hydrate, paraffin, sand deposits and plugs, acid treatment of the bottomhole zone, and so on), without damping them at a pressure at the sealed mouth of up to 70 MPa.
The field of application is the implementation of technological operations for the restoration of oil, gas and gas condensate wells.
Type of climatic design For category 1 according to GOST 15150-69.
Mounting base MZKT-65276 YAMZ-7511 power plant Engine power, kW (hp) 300 (400) Total weight, kg, not more than 59000 Maximum travel speed, km/h 45 Maximum pressure at the wellhead during work, 70 MPa The maximum injection pressure of the process fluid allowed by the installation design, 70 MPa
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.