Top.Mail.Ru

COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)

Special machinery manufacturer:
Condition:
Not specified
Availability:
Not specified
#30789
Specifications
The installation is designed for the following operations:
- for routine repairs of wells equipped with rod-type plug-in pumps in order to replace the PUS and carry out treatments of the bottomhole zone and the borehole, flushing the tubing column, well development, etc. using non-coupling long-length pipes (hereinafter referred to as BDT);
- for repairing wells with a hook load of up to 8 tons;
- screwing and unscrewing the socket Ø16-25mm.

Mounting base Three-axle trailer with YAMZ-238 deck power plant
YAMZ-385 power plant
Power plant capacity, hp 240
Mobile repair workshops
A UNIT FOR THE REPAIR AND MAINTENANCE OF ROCKING MACHINES (ARCHES)
A UNIT FOR THE REPAIR AND MAINTENANCE OF ROCKING MACHINES (ARCHES)
Negotiable price
REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
Negotiable price
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
Negotiable price
Mobile repair workshops Manufacturer ЕЛАЗ
A UNIT FOR THE REPAIR AND MAINTENANCE OF ROCKING MACHINES (ARCHES)
A UNIT FOR THE REPAIR AND MAINTENANCE OF ROCKING MACHINES (ARCHES)
Negotiable price
REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
Negotiable price
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
Negotiable price
Transport special equipment
Curtain semi-trailers MEUSBURGER NOVTRAK ZP-224
Curtain semi-trailers MEUSBURGER NOVTRAK ZP-224
Negotiable price
BONUM semi-trailers 914296-04
BONUM semi-trailers 914296-04
4 900 000 ₽
BONUM semi-trailers 914296-04
BONUM semi-trailers 914296-04
5 150 000 ₽
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
COILED TUBING INSTALLATION COMBINED WITH A GANTRY TYPE MAST (UKPT-10)
Negotiable price
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with the Personal Data Processing Policy.