The HGP32 concrete distribution boom is used in combination with a concrete pump and can rise as the floors of a building under construction are poured, making it an ideal device for concreting. Advanced technologies of Schwing distribution machines were used in the design work, and finite element analysis was one of the design methods. The design of the concrete distribution boom consists of such elements as: foundation, standard sections assembled, lifting device, rotating base, rotary platform assembled, boom assembled and protective installation; hydraulic and electrical components include a rotary mechanism and a slewing bearing, a power unit, lifting cylinders and boom departure changes, the principle of operation hydraulic system and concrete pipeline, electrical system, hydraulic tank and lubrication of the rotary mechanism.Foundation × 1 set The package includes: • 4-meter column × 2 sets; • 6-meter column × 2 sets; • Work platform and ladder × 1 set; • lifting frame and accessories × 3 sets; • Hydraulic jack and additional elements × 2 sets.Warranty: 14 months or 2000 m/h
Specifications:
Engine Model YE3-180L-4 V1 Output power, kW/RPM 22/1470 Maximum concrete delivery radius, m 32 Angle of rotation of the boom, ° 370 Pressure in the system, Mpa 33 Fuel tank capacity, l 120 Working environment temperature, °C -20...+50 Manual/Wired/Remote control Independent height, m 24 Column type (2 × 4 + 2 × 6) m Installation method Floor surface Lifting speed, m/min 0.5-0.8 Lifting stroke, m 0.5 Lifting type Hydraulic Jack Lifting condition, m 6 Distribution status, m 6 Stationary state, m 6 Fuel consumption, l 34
The working area:
Length of the 1st boom section, mm 9155 Angle of rotation of the 1st section of the boom, ° 90 Length of the 2nd boom section, mm 7715 Angle of rotation of the 2nd section of the boom, ° 180 Length of the 3rd boom section, mm 7755 Angle of rotation of the 3rd section of the boom, ° 180 Length of the 4th boom section, mm 6682 Angle of rotation of the 4th section of the boom, ° 240 Diameter of the exhaust pipe, mm DIN125 Length of the final flexible sleeve, m3
Connection will be made via internet - no charges apply. Microphone access required.
Share
Leasing
Adding to Favorites
Your comment:
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.