Top.Mail.Ru

Installing the HDD DRILL TO ZT-110/165

Special machinery manufacturer:
Condition:
Not specified
Availability:
Not specified
#30606
Specifications
A model in a number of ZT installations of the Maxi class. It is equipped with a Cummins engine with a capacity of 264KW. This power unit is sufficient to develop a torque of 45,000 Nm, and the speed of rotation of the drive shaft can reach up to 150 rpm. All this is possible thanks to the Sauer-Danfoss pumps installed on the machine. The installation dimensions are 11650x2500x2700mm and the weight is 25 tons.
...
The installation body
The case design is designed for maximum ease of installation maintenance. The small dimensions allow the installation to be used in urban environments. The noise insulation inside the enclosure also contributes to this.

...
Drilling carriage
The carriage, designed for drilling angles of 10-18 degrees, is mounted on a frame with metal tracks. The tracks themselves have rubber spacers, which allows the installation to be used in conditions with almost any coating, without the risk of damage.

...
Feeding of drilling rods
Optionally, the installation can be equipped with an automatic carousel rod feed. Semi-automatic feeding can also be installed.

...
Rear stabilizers
Two position stabilizers located in the rear part fix the drilling complex not only during drilling, but also during the transportation of the installation on a trawl. The stabilizers are controlled using an operator's remote control.

...
Operator's cabin
The modern operator's cabin with panoramic glass, protection and the possibility of rotation - gives a full view of the entire drilling rig from the carriage to the vise. This allows you to control the operation of all systems of the complex without getting up from a comfortable operator's chair with many adjustments and comfortable armrests. The cabin has air conditioning and a heater for comfortable operation at any time of the year. An LCD monitor is located opposite the operator's chair to display all the parameters of the drilling complex operation. The location of the monitor does not block the view of the installation sites, at the same time it is always in front of the operator's eyes.

...
Control Panel
There is an LCD display on the control panel to display all the parameters necessary for the operator during the drilling process.

...
Anchor plate
A plate for drilling anchors is located in the front of the installation. This allows the drilling rig to be securely fixed at the drilling site.

.. The
rod rotation reducer
and rack-and-pinion drive system used in the installation allows to increase the strength and smoothness of the carriage. The carriage itself is equipped with a mechanism for increasing the pulling force to 165tons, which makes it possible to easily move the column of drilling rods and complete drilling in difficult situations. Rotation motors - allow you to develop a torque of up to 45000Nm, and the rotation speed can reach up to 150 rpm.

...
Barbell unwinding vise
When using a vise, minimal wear of the drilling rod threads is achieved. The vise is equipped with an automatic lubrication system for drilling rod threads.

...
Bentonite pump
A drilling pump with ceramic cylinders is located at the rear of the drilling complex. The pump capacity is 800l/min and the pressure is 10MPa.

...
Engine
The ZT 110/165 is equipped with a 264KW CUMMINS engine. This power unit is sufficient for the operation of all components of the drilling complex.

...
Hydraulics
Sauer-Danfoss oil pumps for rotation, feed and reverse thrust ensure reliability, stability and guaranteed operation of the hydraulic system of the HDD installation.

...
Crane manipulator
A manipulator crane with a lifting capacity of 2 tons is installed on the machine. It is possible to install a crane up to 3.2 tons.

...
Washing gun
It is intended for cleaning the drilling tool and the machine itself after drilling.
Horizontal directional drilling rigs
Installing GD200F-L/LS HDD
Installing GD200F-L/LS HDD
Negotiable price
Installing GOODENG GD70S
Installing GOODENG GD70S
Negotiable price
Installing the Drillto ZT-45/90CDF HDD
Installing the Drillto ZT-45/90CDF HDD
Negotiable price
Horizontal directional drilling rig DRILLTO ZT 42A
Horizontal directional drilling rig DRILLTO ZT 42A
Negotiable price
Horizontal directional drilling rigs Manufacturer Drillto
Installing the Drillto ZT-06 HDD
Installing the Drillto ZT-06 HDD
Negotiable price
Installation of HDD brand DRILL ZT-80/120B
Installation of HDD brand DRILL ZT-80/120B
Negotiable price
Installing the Drillto ZT 80/160AT HDD
Installing the Drillto ZT 80/160AT HDD
Negotiable price
Installing the HDD DRILL TO ZT-280
Installing the HDD DRILL TO ZT-280
Negotiable price
Construction special equipment
Concrete mixers FAW J6P CA5250 6x4
Concrete mixers FAW J6P CA5250 6x4
Negotiable price
Concrete mixers FAW J6P CA5250 8x4
Concrete mixers FAW J6P CA5250 8x4
Negotiable price
Komatsu PW130 trenchers
Komatsu PW130 trenchers
Negotiable price
MOBILE LIFTING UNIT FOR REPAIRING AND DRILLING WELLS BASED ON A SEMI-TRAILER (UPRB-125)
MOBILE LIFTING UNIT FOR REPAIRING AND DRILLING WELLS BASED ON A SEMI-TRAILER (UPRB-125)
Negotiable price
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with the Personal Data Processing Policy.