Specifications
EUROMIX ALFA 360/9000 stationary concrete batching plant.3.30 (BELT) (main module): capacity up to 360 m3/h, two-shaft concrete mixer SM MV 9000, weighing system for dosing cement and aggregates, weighing system for dosing water, weighing system for dosing additives (optional), semi-automatic control system EUROMIX LOGIC.
Option: 3 bins of inert materials of 15 m3 each.
EUROMIX ALFA 360/9000 stationary concrete batching plant.3.30 (TAPE) produced by MP "EUROMIX PLANT" is designed for the preparation of concretes of various grades, according to a given formulation of the mixture, based on cement, inert aggregates, water and liquid additives.
The plant consists of the following main modules:
module for operational storage and dosing of inert aggregates;
inert filler feed module;
mixing unit based on a two-shaft concrete mixer SM MV 9000 (Italy);
the module of weighing dispensers (weighing dispensers of cement, water and additives).
The module for the operational storage and dosing of inert aggregates consists of sand and gravel bunkers, under which a weighing belt conveyor LC is installed. The hoppers and conveyor are fixed on a single frame metal structure. Sand and gravel are loaded into the appropriate bins by a front loader. The unloading of material from the bins during the dosing process is controlled by pneumatically controlled jaw valves. The weighing of the components during the dosing process is carried out alternately using strain gauge weight sensors on which the LC conveyor is suspended.
The inert aggregate supply module, which uses the LC conveyor belt, is designed for continuous transportation of a dose of inert aggregates from a weighing conveyor to a two-shaft concrete mixer SM MV 9000.
The mixing unit is a frame metal structure on which a two-shaft concrete mixer SM MV 9000 is installed, designed for mixing components and unloading the finished mixture into an auto mixer.
The weighing dispenser module is a single frame on which three hoppers are suspended on strain gauges, directly above the concrete mixer.
The DMTS 2500T cement weighing dispenser is designed for weighing cement during loading, and further unloading a dose of cement through a pneumatically controlled discharge gate by gravity into a concrete mixer. The material is loaded into the hopper using a screw conveyor (auger).
The DMV 1500T water weighing dispenser is designed for weighing water during loading, and further unloading the dose through a pneumatically controlled discharge gate by gravity into a concrete mixer. Water is loaded into the hopper using a vortex pump.
The DMD 30T liquid additive weighing dispenser is designed for weighing the additive during loading, and further unloading the dose through a pneumatically controlled discharge gate by gravity into a concrete mixer. The additive is loaded into the hopper using a vortex pump.
The operation of all mechanisms and systems, as well as the operation of the plant as a whole, is carried out automatically, according to the algorithm described below and the formulation of the mixture specified in the controller of the automated control system included in the delivery package of the concrete plant. During operation, the operational storage bins of inert materials, as well as weighing dispensers with cement and liquid components, must be filled.