*Car tower* 32m and *truck crane* 32m for pipe dismantling
We start on Monday.
An asbestos pipe runs along the facade. The height is 7 floors. About ~25m
Work for 2-4 days. Assistants 2-3 people per car tower.
The pipe consists of sections. We use a car tower to lift the guys to a height. We punch through the pipe from both sides, thread the rollers and remove the section with a crane.
If it doesn't work out, you'll have to cut it off. Then there's a 4-day job here.