1. **Assessment of the condition of the pavement and preparation of a work plan**: - Specialists inspect the road to assess the thickness of the asphalt, the condition of the foundation and the availability of communications under the road. A work plan is drawn up based on the data obtained.
2. **Site preparation**: - Fences and warning signs are installed to ensure the safety of work. - Utilities are switched off if necessary.
3. **Removal of asphalt pavement**: - Using milling machines, the top layer of asphalt is removed. Milling allows you to carefully remove the coating without damaging the road base. - If complete removal of asphalt and substrate is required, a hydraulic hammer or other heavy machinery is used to destroy the coating and its subsequent removal.
4. **Cleaning and garbage collection**: - All dismantled materials are collected and disposed of. This stage includes loading the debris onto trucks and transporting it to landfills for recycling or burial.
5. **Cleaning and preparation of the site for subsequent work**: - The site is cleared of small debris and debris. If necessary, the base is leveled and compacted to prepare for the installation of a new coating or other construction work.
Connection will be made via internet - no charges apply. Microphone access required.
Share
Adding to Favorites
Your comment:
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.