Drilling and Piling Works LLC, performs work on driving reinforced concrete piles (section 300x300; 350x350) and metal sheet piling in the Sverdlovsk region (we work throughout the Ural region), using the following equipment: - new drilling rigs KoG12-0.1.1-01 (SP-49D), base T-10MB.2121-0 (bolotnik running gear) the length of the driven piles is 12 meters or less; - with a tubular diesel hammer SP–76A (impactor weight 1800 kg., impactor energy 42 kJ); or SP-77A (impactor weight 2500 kg., impactor energy 59 kJ.). We will check the bearing capacity of piles (dynamic tests) of control piles. Extensive work experience.