The installation is designed for the following operations:
- for routine repairs of wells equipped with rod-type plug-in pumps in order to replace the PUS and carry out treatments of the bottomhole zone and the borehole, flushing the tubing column, well development, etc. using non-coupling long-length pipes (hereinafter referred to as BDT);
- for repairing wells with a hook load of up to 8 tons;
...
The RKU-25 coiled tubing installation is designed for launching and lifting and technological operations using BDT during major, routine repairs and intensification of oil and gas wells (elimination of hydrate, paraffin, sand deposits and plugs, acid treatment of the bottomhole zone, and so on), without damping them at a pressure at the sealed mouth of up to 70 MPa.
The field of application is the implementation of technological operations for the restoration of oil, gas and gas condensate wells.
...
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.