REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45
The RKU-25 coiled tubing installation is designed for launching and lifting and technological operations using BDT during major, routine repairs and intensification of oil and gas wells (elimination of hydrate, paraffin, sand deposits and plugs, acid treatment of the bottomhole zone, and so on), without damping them at a pressure at the sealed mouth of up to 70 MPa.
The field of application is the implementation of technological operations for the restoration of oil, gas and gas condensate wells.
...