The HW and HF models allow you to work with immersion of reinforced concrete piles up to 7 meters long (HF-36) and drill up to 30 meters (HW-6B). The productivity of these installations in an 8-hour working shift: immersion of 30-35 pile elements, drilling of 100-200 wells....
The HW and HF models allow you to work with immersion of reinforced concrete piles up to 7 meters long (HF-36) and drill up to 30 meters (HW-6B). The productivity of these installations in an 8-hour working shift: immersion of 30-35 pile elements, drilling of 100-200 wells....
The HW and HF models allow you to work with immersion of reinforced concrete piles up to 7 meters long (HF-36) and drill up to 30 meters (HW-6B). The productivity of these installations in an 8-hour working shift: immersion of 30-35 pile elements, drilling of 100-200 wells....
The HX-26 digging rigs only allow the immersion of a base for a road fence up to 2,600 mm long and drilling up to 1,700 mm. Ideal for road fence installation work. They have high productivity: sinking 30-40 piles per hour, drilling 1,700 mm in a few minutes....
The HX-26 digging rigs only allow the immersion of the base for the road fence up to 2600 mm long and drilling up to 1700 mm. Ideal for road fence installation work. They have high productivity: sinking 30-40 piles per hour, drilling 1,700 mm in a few minutes....
We manufacture and supply full-turn mining rigs with increased lifting capacity for submerging solid pile elements up to 18 meters, depending on the model. Our installations allow the immersion of butt piles with a total length of up to 48 meters (model H128). The production facilities are located in China....
We manufacture and supply full-turn mining rigs with increased lifting capacity for submerging solid pile elements up to 18 meters, depending on the model. Our installations allow the immersion of butt piles with a total length of up to 48 meters (model H128). The production facilities are located in China....
We manufacture and supply full-turn mining rigs with increased lifting capacity for submerging solid pile elements up to 18 meters, depending on the model. Our installations allow the immersion of butt piles with a total length of up to 48 meters (model H128). The production facilities are located in China....
We manufacture and supply full-turn mining rigs with increased lifting capacity for submerging solid pile elements up to 18 meters, depending on the model. Our installations allow the immersion of butt piles with a total length of up to 48 meters (model H128). The production facilities are located in China....
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.