Front bucket capacity: 1.1 m3 (standard bucket); Load capacity of the front bucket at maximum lifting height: 2 tons; Standard volume of excavator bucket: 0.3 m3; Maximum digging depth: up to 5.46 meters; Weight: 8.07 tons (depends on the model and equipped equipment);
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.