The HW and HF models allow you to work with immersion of reinforced concrete piles up to 7 meters long (HF-36) and drill up to 30 meters (HW-6B). The productivity of these installations in an 8-hour working shift: immersion of 30-35 pile elements, drilling of 100-200 wells.