Your city — Москва?

REPAIR COILED TUBING INSTALLATION FOR DIRECTIONAL WELLS RKU-25/45

Negotiable price
Profile
АО "ПО ЕЛАЗ"
Елабуга
+7 (800) 700-16-25
Special machinery manufacturer:
ЕЛАЗ
#30788
Description
The RKU-25 coiled tubing installation is designed for launching and lifting and technological operations using BDT during major, routine repairs and intensification of oil and gas wells (elimination of hydrate, paraffin, sand deposits and plugs, acid treatment of the bottomhole zone, and so on), without damping them at a pressure at the sealed mouth of up to 70 MPa.

The field of application is the implementation of technological operations for the restoration of oil, gas and gas condensate wells.

Type of climatic design For category 1 according to GOST 15150-69.

Mounting base MZKT-65276
YAMZ-7511 power plant
Engine power, kW (hp) 300 (400)
Total weight, kg, not more than 59000
Maximum travel speed, km/h 45
Maximum pressure at the wellhead during work, 70 MPa
The maximum injection pressure of the process fluid allowed by the installation design, 70 MPa
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with the Personal Data Processing Policy.