Weight: The weight of the loaded semi-trailer, not more than, kg
8 500
Weight of the transported cargo (technically permissible), kg
29 500
Load on the SSU, kg
11 000
Axial load, kg
27 000
Axes "Tonar": Wheel axles
Tonar
Tires
Tubeless 385/65R 22.5
Pendant
dependent, on longitudinal elastic levers with pneumatic elastic elements and telescopic hydraulic shock absorbers
Lifting axle
the front
Other features Back wall
aluminum swing gates
Side walls
made of aluminum profile
Paul
Cargo Floor sliding floor system
Body volume, cubic meters
89
Support device
for 24 tons The sliding floor consists of a series of longitudinal aluminum beams that are hydraulically driven. The drive is three-section. Each section of the beams is powered by its own hydraulic cylinder. The beams perform reciprocating movements in the longitudinal direction. During unloading and loading, all sections of the beams move simultaneously (the beam stroke is 200 mm.). When the beams are reversed, the sections move alternately. Then the cycles repeat and the load moves. The time of full unloading is 15 minutes.
No risk of overturning of the semi-trailer during unloading, in comparison with semi-trailers with dump truck lifting. Loading and unloading takes place horizontally, relative irregularities are not dangerous, as well as unstable soils of unloading sites. Unloading can be carried out in rooms with a ceiling height not much higher than the actual semi-trailer (low warehouses, factory workshops, docks). Full control of the hydraulic structure from a manual remote control. The design of the sliding floor does not require any routine technical support during operation. The ability to load and unload without using a loader inside the body.
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.