At 9:00 a.m. tomorrow, we need a long gauge with 1.5m horsepower
Loading։ 2nd Yuzhnoportovy passage
Unloading Staromaryinskoe highway
Cashless payment with VAT
AV SPECTECH
On 14.08 by 8.00
JCB needs a bucket and a hydraulic hammer
A point on the map
55.643809,37.589047
https://yandex.ru/maps/?whatshere%5Bzoom%5D=18&whatshere%5Bpoint%5D=37.589047,55.643809&si=4zfx6nmuvz7k9pmdva5gmnbd1m
*Car tower* 32m and *truck crane* 32m for pipe dismantling
We start on Monday.
An asbestos pipe runs along the facade.
The height is 7 floors. About ~25m
Work for 2-4 days. Assistants 2-3 people per car tower.
The pipe consists of sections. We use a car tower to lift the guys to a height. We punch through the pipe from both sides, thread the rollers and remove the section with a crane.
If it doesn't work out, you'll have to cut it off. Then there's a 4-day job here.
We need a car tower and a crane
Address:
https://yandex.ru/maps/213/moscow/house/dolgorukovskaya_ulitsa_5/Z04YcAdjSEMEQFtvfXt2c3VqZw==/
By cash or transfer.
FOR TOMORROW at 9:00
Mini excavator 2 -2.5tons
3rd Paveletsky passage, 7k1
remove the blind area to the side of the building and dig the foundation
Payment by BN with VAT
BOS DEKAR STROY
For tomorrow 14.08 by 8.00
Manipulator 10/7
A point on the map
55.643809,37.589047
https://yandex.ru/maps/?whatshere%5Bzoom%5D=18&whatshere%5Bpoint%5D=37.589047,55.643809&si=4zfx6nmuvz7k9pmdva5gmnbd1m
Work on the spot
STROYPROGRESS
For tomorrow
Ogorodny passage -Zelenograd
Long-range transportation of the headquarters
2-3 flights
Payment by scans
B/n with VAT
write in the personal account
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the Personal Data Processing Policy.