Wheeled excavators, Khimki
The work is scheduled from September 15th.
Excavator 4ed 1 m/cubic meter , with a floor plan .
The working period is from 2 months
Address: Khimki, Kurkinskoe highway.
The front of the work, digging the excavation .
Schedule 5/2 or 6/1
shift from 8 to 11 o'clock.
There are guards
The work is scheduled from September 15th