Nikulinskaya 11 page 4
23.06. 9-30
Rotary Crawler Excavator
It is necessary to dig and dismantle the well (lid, 2 rings ks 15-9, bottom 15)
, Deepen the well and mount back the bottom, 3 rings, lid
Shift
to 180th
*For tomorrow at 9:00*
EP is equal to the wheel bucket
From 3 shifts
Digging, transportation of soil,
Sretensky Boulevard metro station
*Cashless payment with VAT*
23.06 for 1 shift
Application for a backhoe loader with gm
Type of work: The retaining wall must be dismantled.
Address: Krasnogorsk d.Pozdnyakovo KP Nikolskaya Sloboda St.
Non-cash VAT payment.
Tomorrow at 10:00
Crane 25-32t all-terrain vehicle
4 hours of work
The sides and racks are hinged
The slings are long
Unloading of modules, transportation within the village, installation
3 modules of 2.5-3 tons each
Module sizes 2.5×6×2.8
A point on the map
56.237122,37.314007
https://yandex.ru/maps/?whatshere%5Bzoom%5D=11&whatshere%5Bpoint%5D=37.314007%2C56.237122&si=rudwg202vhj1r17u37ah1qemh8
Cash
We use cookies. By continuing to use the site, you agree to the use of cookies and personal data processing in accordance with
the personal data processing policy.