Manipulators (CMU), Zelenograd
Manipulator 7/10
complete task for tomorrow 07/28/2025:
Cable laying at the address: Khimki, Skhodnya, Pervomaiskaya 25.
that is, the manipulator will transport drums with cable there to the trench, between the cable "pickups" it will transport HDPE pipes (pipe loading: https://yandex.ru/maps/10758/himki/?ll=37.294077%2C55.952307&mode=whatshere&whatshere%5Bpoint%5D=37.293670%2C55.952623&whatshere%5Bzoom%5D=17.53&z=17.53
Unloading of pipes: Skhodnya, Oktyabrskaya 35)
Also, between the "pickups" you need two drums with the remains of the cable from Kirova street, 19 to Oktyabrskaya Street, 35.
It's all a Gangplank.